Highlights
Coursework
You are asked to consult on the installation of PV system in the commercial building depicted in Figure 1.
The building has the following characteristics:
Location: Woking, UK (51.326545, -0.544324)
Building area: 250 m2
Roof tilt: 40o
Roof area: 119 m2
You also know that average electricity needs for commercial buildings can be roughly estimated as 78 kWh/m2 /year. Consultancy requirements
You have to consult on the size and type of system (on or off grid). In specific, you have to present:
1) The case for the appropriate size of On-Grid System [10]
2) The case for the appropriate size of Off-Grid System [10]
3) NPV analysis [10]
4) IRR analysis [10]
5) Payback analysis [10]
6) Performance of the potential systems [10]
7) Select option and justify [20]
8) How would a change (increase or decrease) in the current Feed in Tariff prices affect the return of the project? [10]
9) Format, language
Assumptions
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.