PNGE 310 : Drilling Assembly Consisting of Drill Pipe - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task:

Task:

Your assignment for this project is to design a drilling assembly consisting of drill pipe and drill collars after gathering data for a known field. The information from surrounding wells and fields can be used to design the drill string and selecting the rotary drilling rig. The site selection process should consider the available data from offset wells in terms of formation properties and should have a minimum depth (TVD) of 8000 ft.

Report the results for rotary drilling rig capacity and/or limitations to drill a new well at the selected field. The major part of the report should include the calculations related to the forces on the drill string.

Report should contain a statement of the problem and the limitations and safety factors used for the design. Include all applicable constraints like social and environmental impact of the selected site in the report. Use appendix for detailed calculations and specifications.

Some examples of data you can use in the preparation of your report are site location and surface maps, formation contacts (or thicknesses), completion interval and type, fresh water and coal seam zones to be drilled through, type of fluid produced and their analysis, formation pressure, fracture gradients, well logs, production tests, and other related information on the subsurface. You may not have all the data listed here. Attach copies of all documents used in the preparation of final report in “pdf” format with proper name convention. Keep a copy of your documents and data for new assignments of this class.

Please keep me informed on your progress and see me or class TA if you need additional assistance. Also, a spreadsheet file will be posted on eCampus within “Homework” folder for you to enter your data. Submit it after saving the spreadsheet file with the name convention given in syllabus no later than February 14. Your final report should be submitted in MS Word format on the “Turnitin” assignment page. Additional links will be provided for submitting supplemental documents. Pictures or photos of write ups and/or equations are unacceptable in the report.

Use handouts and available catalogs for equipment selection. Each individual is responsible for submitting a final report. More information regarding the report format and grading rubrics will be posted

 

This PNGE 310  : Engineering  Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.