Assignment Task -           
     
 

Task 1 - Scenario 

You have purchased a block of land located in a new housing estate on the Gold Coast. 

The proposed house is to be a split-level design, with part of the house being one storey and  the other part being two storeys. The overall dimensions of the house are 12 x 18 metres. 

 

From your land analysis and site inspection you have observed the following: 

The lot is 20 m wide and 40 m deep 

The lot slopes down from the road at 1 in 10 (or ~6o) and a retaining wall is likely to  be used at the rear of the property.  

The road has an AHD of 25.0 m 

There are three 6 m tall trees on the site. Two of them sit within the proposed building  area and one sits 4.0 m behind the proposed building area. 

RP Data has revealed that there is an easement at the rear of the property (inside the  lot boundary) 

The site is covered by the following two overlays: 

“High potential bushfire Hazard” 

•  “Noise Corridor” – due to a nearby main road 

The soil test on the adjacent site (which you built on in the past) reported that site as  an ‘M Class” site.  

A water meter, communications pit and green power box were found at the front of  the site.  

The storm water and sewer mains and connection points were unable to be  identified/found during the preliminary site investigation Complete the following tasks 

a) Make a rough sketch of the site and proposed house based on the following notes: • This is to be communicated through a site plan and a site cross-section.  • This does not need to be scale but should include references to the above  information. 

Include all service paths and add notes on service locations and stormwater  management.  

b) Should the architect/developer/builder obtain a copy of the survey plan AND title  search before finalising construction and beginning construction? Why, or why not?

c) The setbacks for the site have been assessed as 2.0 m for the sides and rear. Are these  mandatory to follow? Explain/justify your answer. (4 marks)

d) Provide advice regarding the three trees found on the site. (6 marks) (~150 word

e) Should the builder use a pitched roof or a trussed roof? Justify your answer

 

Q3 - General building design principles (27 marks) 

a) The thermal and acoustic design of a structure can be addressed through a number of  features of a house. Identify four features or design strategies of a house that are used  to achieve effective and efficient management of thermal and/or acoustic performance  and discuss how they can assist/be designed for superior thermal/acoustic performance. 

b) Waterproofing and moisture management is an essential part of any residential  construction. Discuss how waterproofing is used in residential housing. Through your discussion be sure to comment on: 

c) What is the purpose of landscaping? Provide perspective from a home-owner, and  from a council/city planner. Use examples of hard landscaping and soft landscaping in  your response .

 

Q4 – Building Process

a) A plumber and an electrician (often called subcontractors) are commonly required at  three different times throughout the construction process of a residential house.  Identify at what stages they would be required and what is being installed during each  visit to site.  

b) Comment on the design and the construction of a window in a residential house  frame. Your discussion should include the materials and elements required to build  the window and the identification of design considerations relating to the choice of  the elements and materials. 

 

This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.