Case Study
A new refurbishment project was planned to add an extra 1,500 seats to a 23-year-old Sports Arena, bringing its capacity to 7,500. A retractable roof and new spectator facilities will also be added to the venue. This project is part of a $360 million larger project featuring eight new indoor courts, 13 outside courts, a plaza and a pedestrian link between the plaza and the arena. The project design team is a joint venture between ABC, a local consultancy firm, and ARC International Group. The client decided to host national games in this arena in 2028. Therefore, there will be no time extension for this project. The refurbishment project is agreed to be delivered in three stages.
Enabling work, foundations, and concrete structures
Erection of the roof
Commissioning of the operable roof and all major services, construction of main building facades and completion of ‘back of house’ facilities including washrooms and change rooms
Key information
Based on the above case stud
Propose or formulate the procurement strategy, contractual arrangement and tendering method that aligns the best with the criteria. The decisions of the planning process for the refurbishment project (you can consider either a total project or refurbishment project only). You may consider but NOT be limited to the following factors.
Project characteristics and their importance
Client’s resources
Risk distribution and accountability
Cost issues over the project life cycle
Funding options and market
Completion time and restrictions
Quality and performance Your proposal for the above must be theoretically sound, practical, and pertinent to the project. You may make necessary assumptions if required.