PART A:Construction schedule
(1) Prepare the construction schedule for the project (house plan provided by your teacher)( you can use the Schedule completed in site supervision) which should include the following:
o Contractual requirements (contract provided by teacher)
o List of sub-contractors and suppliers required for this project (they should be have already been added into you construction schedule)
o Conditions of Approval by local government, council and regulatory bodies (building Permit)
o Human and physical resources required to complete each activity
o Apply contract rates to materials and labour requirements
o Timeframes required to complete each activity
(2) Using the template provided please complete a protection of works notice for the job (you can use the protection of works notice completed in Site supervision)
(3) Colour selection of external materials explain the process you would go over with the client
PART B:Variation Scenario
o While excavating one corner of the project you find the soil below is unsuitable for supporting the foundation.
(1) Evaluate impact
o Researchthe domestic building contract and identify the implications that this variation has on the project costs and your site file and explain what the contract has to say?
(2) Request for approval
o Make a builder variation request to the client (use the template provided)
o Request for extension of time (use the template provided)
(3) Assume that you have approval form the client and…
o Amend the construction schedule to reflect the changes
o Make changes to plans and specifications
o Apply contract rates to materials and labour to variation
o Complete the “Call forward sheet” identifying 3 additional items (use call forward template provided)
o Sketch the impact of variation on services overlay (using the overlay drawing provided)
(4) Material and supply information
o Identify 1 construction material required while conforming to the variation and gather information about the lead-in time while ordering the material and the delivery requirements/special considerations for using this material.
Submission Requirements:
1) Construction Schedule and variation documents
2) Responses to questions
3) Call forward sheet
4) Protection of Works Notice
5) Builders Variation and Extension of Time Request
6) Answers to the below questions
Questions
List the relevant construction codes, standards and regulations required to be used when developing documents used in the operation and structure of costing and a contracting system?
According to the legislation, explain the following: There are two commonly used Labour employment systems using the table below, what is the difference between Employees and Sub-contractors
There are two commonly used Labour employment systems using the table below, what is the difference between Employees and Sub-contractors
Identify 2 types of construction drawings and specifications used in the construction industry?
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.