Assignment Task:

Assessment Details: 

This assessment is designed to assess your technical skills in planning and communicating a project effectively. You required to work individually, select a project case (either from the provided links to the real-life projects or a project case from an organisation of your selection). The project should be in final stage of initial process, with either a signed off project charter or in the stage of getting the approval of the project charter. 

You are required to write a report of scope management plan, schedule management plan and cost management plan. This report should include an introduction to the project case, a stakeholders’ register, a brief project charter, project Scope management that includes: project justification, in-scope and out-of-scope, constraints, Limits, assumptions, technical requirements, statement of work (SOW) and priority matrix (use the provided template). WBS structure (minimum of three levels), WBS dictionary, work packages and linking WBS to OBS, scope verification and validation methods, scope change control, and designing the change control boards (CCB) and roles and responsibilities. You are required to continue working with your group on the selected project and develop and write a schedule management plan that includes processes, tools and techniques to be used and documents to be developed as per your client’s requirements, define activities (activity list, proper activity logic, activities identification), milestones list, activities sequence, relationships (F_S, S_S, S_F, F_F), Lags, leading times, project network and critical path(s), estimates of activity duration (basics of estimation, durations, resources estimation and allocation), roles and responsibilities in scheduling, and monitoring and controlling schedule (EVA relevant to project schedule) Just provide a description of the methods and tools. 

Since we are moving to online teaching and you don’t have access to MS Project at APIC Lab, you are required to develop schedule plan, and develop schedule baseline using the Technique of Gantt Chart you learned in class, and to develop resources plan (resource sheet and allocation for each activity) using tables and figures by using MS Word. You also require to develop and write project cost management plan that includes: plan cost management (identify processes, tools and techniques to be used and project documents to be developed as per your client’s requirements), define cost elements (labour, material, variable cost), identify types of cost (direct, indirect, fixed, variable), determine the estimating method (s): (top-down, bottom-up), use estimating techniques (analogous, parametric, three-point method) to estimate budget (creation): establish a time-phased budget, provide a discussion on monitoring and controlling cost (EVA relevant to project cost including forecasting and variances), and establish a cost baseline. This all can be done in MS word. 

For successful completion of this assessment, you require to study the material provided (lecture slides, tutorials, and reading materials), engage in the unit’s activities, and in the discussion forums. The prescribed textbook is the main reference along with the recommended reading material. You are expected to discuss your work with the lecturer and to seek support. 

Links to real-life projects: (those are mainly infrastructure and construction project, it is not compulsory to use it as your case, you can select a project from your area of expertise).

Provides:

-Plan schedule management

-Scheduling process and activity identification

-Gantt chart 

-Cost account in deliverables has extrapoint

-Use Harvard referencing

Recommended table of content

  1. Project charter

    1. Background

    2. Charter component

  2. Scope definition

    1. Project Scope statement

      1. Project Boundaries

      2. Objectives

      3. Deliverables

      4. Milestone

      5. Project assumption

      6. Constraints

      7. Exclusions

      8. Acceptance

      9. Technical requirements/equipment

      10. Review and customer

    2. Work breakdown structure WBS

      1. WBS Dictionary 

    3. Scope Validation

    4. Control Scope

Please add more contents (some of them missing)

Criteria

  • written communication skills 

organisation; grammar; spelling; clarity of expression; formatting; use of charts and graphs as per project management best practice

  • Introduction 

Background to the project (Project objectives and main deliverables) Requirements elicitation and acceptance Stakeholders’ register and Project team (Roles and responsibilities) Project charter (brief using the provided template)  

  • Project Scope management 

Project justification In-scope and out-of-scope Constraints Limits Assumptions Technical requirements Statement of work (SOW) Priority matrix (use the provided template) WBS structure (minimum of three levels) WBS dictionary Graphical and outline format of WBS Work packages Control (cost) accounts Linking WBS to OBS Scope Validation and control Scope change control Change control boards (CCB) and roles and responsibilities 

  • Project Schedule 

Plan schedule management (identify processes, tools and techniques to be used and document to be developed as per your client’s requirements) Define activities (activity list, proper activity logic, activities identification) Milestones list Activities Sequence Relationships (F_S, S_S, S_F, F_F) Lags, leading times Project network and critical path(s)Estimating activity duration (basics of estimation, durations, resources estimation and allocation) Roles and responsibilities in scheduling Monitoring and Controlling Schule (EVA relevant to project schedule) Just description of the methods and tools Schedule baseline 

  • Project Cost Management 

Plan cost management (identify processes, tools and techniques to be used and project documents to be developed as per your client’s requirements) Cost elements (labour, material, variable cost) Types of cost (direct, indirect, fixed, variable) Estimating method (s): top-down, bottom-up Estimating techniques (analogous, parametric, three-point method) Contingencies and management reserves Budget (creation): time-phased budget Monitoring and Controlling Cost (EVA relevant to project cost including forecasting and variances) only description Cost baseline

This Management Assignment has been solved by our Management Experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.