This assessment requires the student to prepare a preliminary estimate for the owner of a proposed residential building to be constructed in Sydney’s CBD. The land is around 385 m⊃2;. Two design plans are under consideration: Scheme A and Scheme B. Students are required to focus on Scheme A, for which the drawings are available in the Assessment 2 Folder; there is no need to calculate costs for Scheme B. You have been given the responsibility to make sure that the design team and the client are aware of the cost of the two alternatives. Upon completion of this assignment, students are expected to be able to:
Provide an Indicative Cost Plan for Scheme A only following the template and requirements of assessment 2. The indicative cost plan should include the following:
Construction costs (at stated base date, May 2025)
Estimated inflation to probable tender date of October 2025
Estimated increased costs payable to contractors during the construction period (2025–2027)
Professional fees
Compare the two options based on your calculation for Scheme A and information given for Scheme B to make a recommendation in line with cost merits. Reasons and rationale for the best scheme need to be detailed.
The assessment focuses on preparing a preliminary cost estimate for a proposed residential building on a 385 m⊃2; site in Sydney’s CBD. Students are required to:
Focus only on Scheme A (drawings provided).
Provide an Indicative Cost Plan including:
Construction costs (base date: May 2025)
Estimated inflation to the probable tender date (October 2025)
Estimated increased costs payable to contractors during construction (2025–2027)
Professional fees
Compare Scheme A and Scheme B based on calculated and given information.
Make a recommendation for the preferred scheme with detailed rationale.
Learning outcomes expected:
Ability to prepare a detailed indicative cost plan.
Understand cost inflation and adjustments over time.
Evaluate construction alternatives based on financial merits.
Communicate recommendations with clear reasoning.
The Academic Mentor guided the student in a step-by-step process to ensure clarity and structured completion:
The mentor emphasized reading the assignment brief carefully.
Key focus areas: Scheme A cost estimation, comparison with Scheme B, and providing justification for recommendations.
Students were advised to review the drawings in the Assessment 2 folder for accurate cost calculation.
The mentor instructed the student to gather relevant cost data, including:
Base construction rates (May 2025)
Inflation indices to October 2025
Estimated construction period costs (2025–2027)
Professional fees (architects, engineers, consultants)
Data was organized in a spreadsheet following the assessment template for clarity.
Mentor guided the student to calculate:
Construction costs using area rates and quantities from Scheme A drawings
Inflation adjustments to probable tender date
Contractor cost variations over the construction period
Professional fees based on standard percentages of construction costs
The student followed a structured table format for each cost category, ensuring transparency and traceability.
Even though Scheme B’s full calculations were not required, the mentor advised reviewing provided information to make a comparative analysis.
Student evaluated cost merits, advantages, and potential challenges of both schemes.
Mentor guided the student to justify the recommended scheme based on:
Overall cost efficiency
Feasibility within budget constraints
Long-term value for the client
Rationale was written clearly to align with professional reporting standards.
Mentor helped the student review calculations and the report for accuracy.
Ensured all sections met the learning objectives and followed the required template.
A comprehensive Indicative Cost Plan for Scheme A was prepared.
The student could:
Calculate construction and professional fees accurately
Apply inflation adjustments correctly
Analyze and compare the two schemes effectively
Present a justified recommendation supported by calculations
Learning objectives met: financial estimation, critical comparison of alternatives, professional communication, and application of construction cost principles.
Looking for a head start on your assignment? You can download our sample solution to see how a professional approach works. Remember: this sample is for reference purposes only. Submitting it as your own work can lead to plagiarism issues and academic penalties.
Want a completely original, plagiarism-free assignment tailored just for you? Our team of professional academic writers can create a fresh solution that meets your exact requirements, helping you:
Save time and reduce stress
Ensure 100% plagiarism-free content
Receive work structured to meet assessment criteria
Gain a deeper understanding of the topic through a professionally crafted example
Protect your grades and learn smartly!
Download Sample Solution Order Fresh Assignment
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.