Highlights
A sketch map with contour lines at 25m intervals is provided. The red lines on the sketch map show two possible new road alignments (X and Y) to cross a river and climb to the flatter high ground. The bearing and distance of each straight is shown and the radius proposed for each of the horizontal curves is also shown.
The green lines are the ends of existing roads which need to be joined. These roads are on the natural surface.
The land below the 100m contour is unoccupied bush land while above the 100m contour is developed farmland in private ownership.
The proposed routes have been drawn by bureaucrats, where their main aim is to avoid existing houses.
Where possible the road should follow the natural surface minimising cut and fill. The proposal has now been passed to the Engineering Department to assess the two possible routes. Your task consists of the following four parts.
Using the horizontal curve data shown (where R is the radius of each curve) calculate the length of each bypass (to 1 decimal place). Also list the chainages of each T.P. along each road. It is not necessary to show all of your working/calculations, but it would be good to show the results of individual calculations.
Some members of council have asked for clarification about the proposed road options as they do not understand the plan provided.
For each road, section by section, as shown at the bottom of the page, describe the road’s horizontal alignment in a sentence or two.
In a few paragraphs, describe the longitudinal slopes of the natural surface along each section. Explain where you would expect substantial vertical curves to be needed in the road design by suggesting appropriate I.P. locations. Further, you must draw attention to any structures that would be needed, such as bridges and bridge approaches. Also identify any areas where you would expect large depths of cut or fill to occur, or difficulties in meeting the design criteria due to the grade of the land.
While the entire road will need to eventually have a final accurate survey completed, for those areas that you have mentioned in part 2 above, to assist with assessing each road’s suitability, more detailed survey work on site will be undertaken immediately. As part of this section, you must suggest possible R.L.s for the decks of any bridges and the impacts that those R.L.s will have on the road design. As part of this assessment process you may also wish to recommend areas to investigate for possible minor horizontal deviations (for example, less then 800m in length and less than 150m sideways deviation) to be included in such survey work if you feel it would help the road design. Please describe what information each of those site surveys should obtain.
Which line (X or Y) would you recommend being adopted? In no more than one page give your reasons for making this decision.
You may find it helpful to draw a longsection of each proposed road.
You should prepare your report on the basis that a maximum grade along the road of 7% is proposed.
River Characteristics
The river is tidal, so assume that the blue line showing the river edge is at R.L 2m. It will flood to an R.L. of 5m once every 10 years.
Report
Please use the following layout for your report. An Answer sheet with headings has been provided.
i) Part 1 – Length of bypass and chainages of each TP.
ii) Road X: Section 1, Horizontal Alignment, Vertical Alignment etc., Extra Survey work needed; then same layout for Section 2 of Road X.
iii) Road Y: Section 1, Horizontal Alignment, Vertical Alignment etc., Extra Survey work needed; then same for Sections 2 and 3 of Road Y.
In your report, please use contour lines, or approximate chainages (or both) to clearly identify the location of features you are referring to e.g. “at the 75m contour line at approx. Ch 5.4km”
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.