Part 1: A manufacturing system comprises 3 sequential processes, i.e. Processes 1, 2, and 3. Each process has its own workstation (resource), i.e. Workstations 1, 2, and 3. Their processing times are constants, respectively as 12, 8, and 11.8 minutes. There are unlimited buffers in front of all workstations. All transfer times between any two Processes, between Create and Process 1, and between Process 3 and Dispose are 0 minutes. The part inter-arrival times to the system are UNIFORM (12,15) minutes. The first arrival is at time 0 and the parts arrive one at a time.
For Workstation 3, there is a probability that a part needs to be reprocessed by Workstation 2 (and then go through Workstation 3 again). The probability for a part to revisit Workstation 2 remains constant and is independent of the number of revisits. This probability of revisiting is 8%.
Develop a simulation model in Arena and make it runs for 16,000 minutes with one replication. Save and upload your answer as Part1.doe.
Requirements:
• Animate the seize area(s) and resource(s).
• Animate the entity as balls. Resize them if they are too big or small.
• Animate the queue(s). Highlight them with rectangular boxes.
Note: You can get different results by defining the True and False branches of your Decide module differently. Both are acceptable.
Questions:
I. How many parts have been processed at the end of the simulation?
II. What is the average utilisation level of Workstation 2?
III. During the simulation, what is the maximum number of visits (visit + revisit) that a part has to go through before reaching Dispose? Hint: You will need to use Assign and Record modules.
Part 2: Based on your model in Part 1, modify it to fulfil the following new conditions.
Conditions:
• All transfer times between any two Processes, between Create and Process 1, and between Process 3 and Dispose are now UNIF (2,3) minutes.
• Parts leaving Process 1 will instantly enter a Cool-down Zone (Storage) and wait for 10 minutes before being transferred to Process 2.
Make it runs for 16,000 minutes with one replication. Save and upload your answer as Part2.doe.
Requirements:
• Animate the entity transfer with Station and Route.
• Animate the cool-down process with Store, Delay, Unstore.
Questions:
I. How many parts have been processed at the end of the simulation?
II. What is the average utilisation level of Workstation 2?
III. On average, how long does it take for a part to pass through the system?
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.
You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.