Site Analysis Requirements for Successful Land Development Assignment

Download Solution Order New Solution

Assignment Task

Site Analysis Requirement 

  • Existing and Proposed Land use
  • Sun & Wind Direction
  • Landscape Feature in and around the site
  • Services-Waterline, Sewer line,Electric line (High-tension Line nearby site or Passing through the site), Storm water manholes, etc
  • ApplicableRegulation as per Site Location. (Town planning Regulation, DCPR, SEZ, CRZ, SPA such as MMRDA ,MSRDC ,MCGM ,MIDC , Any other.)
  • Open spaces on Site plan (margin, open ground, amenity plot
  • (Soil types, Water table etc.)
  • SWOT Analysis: Using Technical Parameters.

This IT Computer Science has been solved by our PhD Experts at My Uni Paper.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.