Site Appraisal & Basement Waterproofing Proposal Report - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task

 

Your task:
Broadly the report is to be split into the following three main parts: -
1. Introduction – clarifying the address and location of the site and the purpose of your report.
2. Initial Site Appraisal – clarifying the results of your desktop studies together with the information supplied by the client in this brief & how these results might impact on the construction of the three-storey steel framed office with a basement level.
3. Basement Waterproofing Design – recommending a suitable basement waterproofing design for the client’s proposed three storey, steel-framed office building. The
basement will be a single level below ground level and there will be three further storeys above ground level. Your report should make use of clear, relevant illustrations where required as well as photos from online sources.
All sources used as part of your report should be referenced using the APA-Harvard style in accordance with University guidelines. If you refer to non-published sources such as plans or project documentations this should be clearly stated in the report.

 

Description of the task;
This assessment requires you to produce a 2500 word client facing report that is formatted in a professional manner that must include, typically, but not limited to the information described below.

  • A front cover in the form of a title page.
  • A contents page listing the title and page number of all sections, subsections, appendices and reference listings.
  • Appropriately numbered sections and subsections in the main body of the report.
  • Body of report to typically include:-

 

Part 1 – Introduction – The introduction should clarify the address and location of the site, the date the report was carried out and by whom. A brief description of the report’s purpose should also be given.

Part 2 – Initial Site Appraisal – This part must communicate to the client the following information:
-A brief description of the site – e.g. Size, shape, location, surrounding buildings etc.
-A brief summary of site history – e.g. past usage (buildings, purpose etc)
-A summary of anticipated potential issues found below ground (such as sewers) and those found above ground (such as adjacent buildings) which might affect the
construction of the building including its basement.
-You should clearly explain how the clients proposed construction might be affected by what you have found in your investigations.

 

 

This Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.