Transport Infrastructure Design
This assignment addresses the following module outcomes
MO1 Apply design principles and standards to transport infrastructure geometric design problems
MO2 Apply design principles and standards to transport infrastructure construction problems
MO3 Generate a number of design options to solve an open ended problem
MO4 Synthesise specifications, standards and site conditions to develop final detailed solutions.
Metrobus South-west facing on and off slip-roads on the M32 at Stoke Lane, Bristol
Metrobus (for more information click here) has been constructed in Bristol. The plan of the routes shown hereindicates the routes for Metrobus. Metrobuses on the proposed North Fringe to Hengrove route need to interchange between the M32 (South) and Stoke Lane (North).
Some people suggestedduring the planning stages that the bridge and slip road arrangement constructed for Metrobus to leave the M32 were unnecessarily costly because of the requirement for the additional bridge. Thisrecently constructed bridge lies North of the current Stoke Lane bridge and its plans are shown in the file ‘Metrobus proposals at Stoke Lane.pdf’ on Blackboard.
Your task is to develop an alternative design which provides South Facing slip-roads just for Metrobus onto and off the M32 from Stoke Lane. This would have cost considerably less, and also would have allowed for shorter journey times between the M32 and Stoke Lane.
You will need to submit the following, which will form appendices to your design report:
Assessment Criteria
The work that you undertake will be assessed according to:
1. The clarity of your design statements (Appendices D1.1)
2. The appropriateness of tabulation of assumptions you make for the design (Appendices D1.2)
3. The appropriateness of the design as expressed in the layout plan and cross-section (Appendices D1.3 and D1.4)
4. The quality of the thinking in relation to preventing non-bus use of the slip roads (Appendix D1.5)
5. Appropriateness of the highway pavement design (Appendix D1.6)
6. The quality of reflection in the main report on the design guidance and the depth of understanding you demonstrate in use of design guidance
7. Compliance with requirement for a single WORD file submission.
This UBGMFX-15-M-Engineering Assignment has been solved by our Engineering Expert at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.
You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.