Unit Learning Outcomes Addressed On completion of this assessment, you should be able to:
1. Apply concept, principles, and skills to estimate the cost of construction work and prepare the tender price.
2. Critically apply estimating principles to construction cost problems.
3. Critically apply estimating principles and provide solutions for tender preparation and bid evaluations.
4. Professionally communicate and plan with peers. Specifications This assessment is worth 40% of your final grade.
Overview
This assessment requires you to apply your knowledge and skills to prepare a relevant cost estimate for typical items of construction work based on the information available; calculate the applicable labour rates for use within this project estimate, including the impact of typical on-costs; identify and secure the information needed to calculate an estimate of labour, materials, subcontractor and plant costs, using relevant methods as required; calculate a 1st principal construction estimate for various components of work using both a manual and software-based methodology; appraise the worth of offers made by sub-contractors and suppliers; prepare a cost estimate of the activities needed beyond the physical work; and determine a strategy for including profit and overhead allowances to determine an appropriate sales price. What you will do You are the Estimator for a medium size development company. Your company has decided to tender on the construction of a new development of 70 townhouses, on a section of land in Brisbane.
The initial Site Plan with land topology and basic outline of a typical two storey townhouse design has been provided. However, the structural/civil engineer has determined that changing the design from a two storey to a single storey will obviate the need of piers & suspended slabs, allowing for a normal footing/slab and therefore reducing the cost of each dwelling. Consequently, the client has just decided that 70 low-set houses will now be constructed as per the drawings provided. Therefore, you as the estimator have been tasked with providing a detailed and accurate estimate to construct this project, including calculating the offsite overhead based on corporate information yet to be provided, and your calculation of the total expected profit ($) assuming a minimum profit of 17.5% is required.
The above Engineering Assignment has been solved by our Engineering Assignment Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.