Highlights
Task
Witness simulation
Coursework Assignment
Create the model and optimise the profit for the plant described in the following. You need to simulate ten days operation after an appropriate warm-up period.
Description
A manufacturing plant that produces gearboxes has to be designed and optimized. Each gearbox is composed of the following components: two gears, two bearings, and one casting.
Costs and Budget
The company has already purchased the CNC workstation for £72K. The CNC workstation needs to be repaid in three years. The plant operates on an eight-hour shift. Operators have a 15-minute break in the morning and afternoon, and one hour for lunch.
Additionally, you have a budget of £15K to set up the remainder of the plant. This expenditure must be repaid within one year.
Costs
Assembly stations with appropriate tooling: £1800
Bins for machined gearboxes: £200
Text bench space per gearbox: £2200
Fixed cost for hiring an operator (advertising, training, etc.): £1500
Operator hourly rate including on-costs: £15.60
Task
Optimise the plant to achieve maximum profit within the allotted budget. You may need to optimise the plant for the priorities of the machines first. The expected profit for each completed and working gearbox is £80.
Investigate what effect a 90-minutes breakdown of the CNC workstation and of the conveyor belt would have on the daily production rate.
Write a report describing your model and present results on a series of tests on the model. In your conclusions, present an evaluation of the model in the light of all the assumptions made and what limitations they place on the model. The report must be in the form of a standard technical report or article and should include:
Abstract
Introduction
This should include some explanation of stochastic modelling and methods and tools available to carry out discrete-event simulation to form a literature review. For example, you might want to discuss software packages other than Witness for discrete event simulation.
You should also introduce the problem by a description of the plant; the use of a block diagram may help.
Methods
Describe your modelling technique and the structure of the Witness model. Justify your approaches to building the model and include any relevant references. Describe the approach to optimisation and describe all equations or functions used.
Results
Present the results of your optimisation and experiments, the expected daily, hourly production and the profit from the plant.
Discussion
Discuss the model, its performance and implications on the real system. Discuss and evaluate the limitations of the model.
Conclusions
Provide some conclusions in a form that will advise the company management on the feasibility and expected returns for the plan.
This Engineering Assignment has been solved by our Engineering Expert at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.
You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.